• Heron Mill

    Posted : Monday, May 15 th, 2017 · Comments : 0
    Refurbishment of mill warehouse
    more
  • Hillside Golf Club

    Posted : Friday, May 12 th, 2017 · Comments : 0
    Redevelopment and modifications M&E
    more
  • Andritz Paper Mill

    Posted : Thursday, July 21 st, 2016 · Comments : 0
    Here we were called on the Friday at around 10am where Andritz the largest paper mill machine manufacturer needed 10 engineers on site in Workington on the Saturday to help an existing on site electrical company complete the works on time as they were behind schedule We sent 7 engineers on the Saturday had 10
    more
  • NDC NDC Automation, Drives and Controls

    Posted : Tuesday, June 14 th, 2016 · Comments : 0
    We worked with Williams Tarr Group on this project to build a new unit next to the existing in Trafford Park. We were responsible for the full electrical design and installation of the unit covering power, lighting, fire alarm, intruder alarms and data points.
    more
  • SLR Consulting

    Posted : Tuesday, June 14 th, 2016 · Comments : 0
    Central Electrical were called by SLR Consulting as they were given our details by another company who highly recommended us to carry out the periodic inspection to 2 sites for Alstom in the Network Rail sites so Health And Safety was and the RAMS were key as they have high voltage cables over head.
    more
  • The Croft Overflow Car Park

    Posted : Tuesday, June 14 th, 2016 · Comments : 0
    Central Electrical were instructed to install low energy lighting to the over flow car park for the Christmas period and did so with in one week.
    more
  • Altertherm Mercure Bristol

    Posted : Thursday, June 09 th, 2016 · Comments : 0
    We worked with Altertherm to carry out the electrical installation of the new air handling units and boilers for the hotel this involved all the 230v and 415v control wiring and also adapting the BMS control panels, all the boilers were CHP (combined heat and power) to generate electricity to power the hotel
    more
  • Hermes Shipping Service

    Posted : Thursday, June 09 th, 2016 · Comments : 0
    We worked with Williams Tarr Group on the new trailer park extension installing all the SWA cables to the CCTV posts and the new lighting system which is LED and is required to have a directional angle of no more than 10 degrees to avoid glare to the nearby M62 motorway. We went one step
    more
  • UP Global Sourcing New Optimizer

    Posted : Sunday, May 15 th, 2016 · Comments : 0
    We carried out the installation of a new Optimizer and Power Factor Correction units to reduce energy consumption to the premises. The Client has since informed us that based on recent readings that their electricity bills are substantially lower and have predicted an annual saving of over £14k a year.
    more
  • Packaging Products

    Posted : Monday, May 09 th, 2016 · Comments : 0
    Packaging Products (Coatings) Ltd is one of Europe’s largest manufacturers of waterproof paper and board serving a wide range of industries home and abroad. With our extensive knowledge of the dated types of machinery they use we are contracted for all electrical maintenance at their large manufacturing factory. We have recently upgraded the drives to
    more